I apologize that this has taken me so long to post, but I have been dealing with a family emergency. I'm currently typing this from my iPad since I had to travel to NY unexpectedly, so if the formatting looks a little weird- I apologize. I will make all adjustments as soon as I get to a desktop to adjust the format.
The remainder of week 13 was pretty slow. Not much happened, and maybe that is because they wanted minimal walking on our newly installed floors. On Thursday (
Day 88) we noticed the A/C people had been by to install all of the vents and the interior condensing unit.
The following day (Day 89) all bathroom counter tops had been installed. Also our dishwasher appeared and waiting in the kitchen. I spoke with our PM for our weekly call and he informed me that our driveway forms was going up in preparation for them to pour the following week.
Up until seeing good picture, hubby was apprehensive about the bathroom Classico granite selection. I love it and he's actually in love with it now.
An up and close view of the master bath countertops.
Our stainless steel dishwasher waiting to be installed
Week 14
Day 92 (11.04.13): I pulled up and noticed lots of movement inside the house. Much to my surprise all of the toilets, sinks, faucets, our water heater, shower heads, and kitchen Granite was being installed. It definitely felt like Christmas as I walked room to room to see a crew working diligently to install different things.
Master sink with faucets
Powder room- we're missing a framed mirror here.
Kitchen view with Granite. Doesn't it look beautiful?
Up close of the St Cecilia Granite.
Day 93: I didn't go by the house
Day 94 (11.06.13): The electrician came by to install all of the outlets, light switches, and lighting through out the home. Our front door was installed and stained, and the railing was stained. We noticed that behind our back door there was some swelling on the wall. When hubby touched it he noticed that a piece of the drywall appeared to have been crushed. We called our PM and he states he saw it during his walk-thru and had plans for someone to come and repair that piece of the drywall. Our cabinet is still M.I.A and our PM was under the impression it would have arriveyf the week before. I'm not picky- I just hope we have that cabinet by closing. The dishwasher is still in the box and waiting to be installed. Maybe they are waiting for our other appliances to arrive before they start installing.
Front door - Hubby's other demand!
Stained stair rail
Kitchen can lights and outlets
Dinning room chandelier
Master bedroom ceiling fan!
Day 95 (11.07.13): hubby visited the house since I'm gone and he reports that all of the carpet was installed. The concrete still has not been poured due to all the rain, but as soon as it dries yo we will have a driveway and several walkways. He states Guardian was present doing their thing and so he stayed out of their way and documented all of green tape markups from the PM.
Looking down the stairs
Upstairs hallway looking into master bedroom,
Our house!
View of other homes in community from an upstairs bedroom
Well folks that's it for now.
Until Next time,
- The Alexander's