Friday, September 20, 2013

Week 7

So much has happened since the last time I've blogged. Our home looks like an actual home and has siding, an almost finished back patio, our back door, plumbing and A/C ducts.


Week 6 Day 41 (09.14.13)

Me hanging on the back patio
 
Standing in the entryway looking towards the living room
 
On the landing look up the stairs 
 
Standing in the middle of the master bedroom
 
Kitchen
 
Week 7 Day 44 (09.17.13)

 
Back of house with our covered patio and 5 feet un-covered for our grill
 
Our back patio with our awesome back door that I love
 
Day 46 (09.19.13)
 
We went to visit the house and all of the plumbing was complete and the A/C guys were working on installing the duct work. As we walked out the PM told us that the electrician should be coming in the following day if all works out to start with all the electrical stuff. We noticed that the garage and living room were full of drywall, so hopefully the insulation will be arriving soon and then drywall!
 
We also got the official notification that our house is ours. Yes that is right our application made it through the final stages of loan approval. They set our closing date for November 28th, but that is Thanksgiving so I am pretty sure that is going to change. We are pushing for them to close on November 25th so wish us luck on trying to make that happen.
 


 
Until next time,
 
-The Alexander's
 